Live Operations
C-Check Bay 4 — Active|02:14 UTC

// MRO Facility — Heavy Maintenance Division

Zero
Squawks.
Every Log.

Wide-body turbines stripped to bare metal, inspected under halogen floods, and returned to service with full regulatory sign-off. EASA 145 · FAA · TCCA certified. Slots available Q2–Q3 2026.

73.9 m / 242 ft 4 in — A330-300
99.2%
Fleet Availability
47
Avg TAT / Days
2.4M
Man-Hours / Year
312
Active Work Orders

// Capability Matrix

Six Verticals.
One Facility.

EASA 145FAA 145TCCA 573CAASGCAA
01
EASAFAA

Engine
Shop.

Full borescope inspection, LLP tracking, QEC build and test cell runs. CFM56-5B/7B, LEAP-1A/1B, V2500 approved.

CFM56 / LEAP
Primary Types
720+
Removals / Year
28d
Avg Engine TAT
02
EASATCCA

Structures

Composite repair, corrosion treatment, SRM-compliant structural repair for fuselage, wing box, and empennage.

A320/A330
Primary Fleet
100%
NDT Capability
03
FAAEASA

Avionics

IFE, FMS, ACARS, ADIRU, transponder and ADS-B upgrades. Bench test and ramp test capability.

4,200+
Part Numbers
14d
Bench TAT
04
EASA

Landing Gear

Full overhaul, actuator rebuild, NDT, and certification for A320 family and B737NG main and nose gear.

6yr / 10yr
Overhaul Cycles
21d
Gear TAT
05
FAAEASA

Interiors

Seat refurb, galley modification, cabin reconfiguration. FAR 25.853 flammability compliance.

96h
Cabin Refresh TAT
180+
STC Configs
06
EASAFAATCCA

NDT / QA

In-house Level III NDT across eddy current, ultrasonic, penetrant, and radiographic methods.

ET/UT/PT/RT
Methods
Level III
Certification
All capabilities in-house — no subcontracting
Updated 2026-02-26

// Case Study — A330 D-Check

48 Days.
Zero Deferred Items.

Day 0

2025-03-04

complete

Induction Phase

Aircraft Received

Full induction photography, logbook audit, and initial workscope review completed within 24h of arrival.

847
Induction Photos
0
Open Discrepancies
42,880
Logbook Hours
Induction CompleteLogs VerifiedBay 3 Assigned

Day 2–5

2025-03-06

complete

Workscope Phase

Workscope Defined

Full D-check workscope including SB 53-3059, AD 2024-11-12, and customer-directed cabin reconfiguration.

312
Base Tasks
47
Customer Add-Ons
18,400
Man-Hours Estimated
MPD ComplianceSB IncorporationAD Status Closed

Day 7–18

2025-03-11

complete

Teardown Phase

Structural Access

Complete structural teardown with zone-by-zone NDT. All panels catalogued on status board with barcode tracking.

1,840
Panels Removed
23
Zones Opened
2,160
NDT Scans
Fuselage OpenedWing Box AccessFuel Tanks Purged

Day 19–32

2025-03-29

complete

Findings Phase

Additional Findings

28 additional findings managed. All Cat A items dispositioned within 48h via dedicated MRB team. Zero deferred items at redelivery.

28
Additional Findings
3
Critical (Cat A)
100%
Approved via MRB
MRB DispositionedEASA 8130 IssuedCustomer Notified

Day 41–47

2025-04-14

complete

Close-Out Phase

Systems Close-Out

All 1,840 panels reinstalled and torqued to spec. 14 ground tests completed including hydraulic, pneumatic, and avionics functional.

1,840/1,840
Panels Reinstalled
14
Ground Tests
0
Punch Items
Zero PunchGround Test CompleteDocs Package Ready

Day 48

2025-04-21

complete

Redelivery Phase

Aircraft Redelivered

Redelivered 2 days ahead of contracted schedule. Full documentation package including EASA Form 1, CRS, and updated logbooks.

48 Days
Total TAT
-2 Days
Vs. Contract
0
Squawks at Delivery
On-TimeZero SquawksEASA CRS Issued
Scroll to explore timeline

// TAT Benchmarks

Faster Than
Industry Average.

TAT performance benchmarked against IATA-published industry averages for equivalent check types. Data current as of Q4 2025.

// Regulatory Approvals

EASA
EASA.145.0842
Europe / ECAA States
Active
FAA
O3YR441Y
United States / ICAO
Active
TCCA
AM-2-0318
Canada
Active
CAAS
CAAS/AMO/245
Singapore / ASEAN
Active
GCAA
GCAA-AMO-0092
UAE / Gulf States
Active
Check Type
Hangar TAT
Industry Avg
Performance
A-Check (Narrowbody)
18h
24h
+25%
C-Check (A320 Family)
21d
28d
+25%
C-Check (A330/B777)
35d
45d
+22%
D-Check (A330)
48d
62d
+23%
Engine Removal/Install
8h
12h
+33%
Landing Gear Overhaul
21d
30d
+30%

// Capability Statement — PDF

Full Approval Matrix + Fleet Coverage

32-page technical capability document. Includes all OEM authorizations, tooling inventory, and fleet coverage tables.

// Slot Availability

Request a Check
Induction Slot.

Current slot availability for Q2–Q3 2026. AOG support available 24/7 — our planning team responds within 4 hours on standard requests.

Contact Details

Workscope Parameters

Slot requests reviewed within 4 business hours · AOG: 24/7