// MRO Facility — Heavy Maintenance Division
Zero
Squawks.
Every Log.
Wide-body turbines stripped to bare metal, inspected under halogen floods, and returned to service with full regulatory sign-off. EASA 145 · FAA · TCCA certified. Slots available Q2–Q3 2026.
// Capability Matrix
Six Verticals.
One Facility.
Engine
Shop.
Full borescope inspection, LLP tracking, QEC build and test cell runs. CFM56-5B/7B, LEAP-1A/1B, V2500 approved.
Structures
Composite repair, corrosion treatment, SRM-compliant structural repair for fuselage, wing box, and empennage.
Avionics
IFE, FMS, ACARS, ADIRU, transponder and ADS-B upgrades. Bench test and ramp test capability.
Landing Gear
Full overhaul, actuator rebuild, NDT, and certification for A320 family and B737NG main and nose gear.
Interiors
Seat refurb, galley modification, cabin reconfiguration. FAR 25.853 flammability compliance.
NDT / QA
In-house Level III NDT across eddy current, ultrasonic, penetrant, and radiographic methods.
// Case Study — A330 D-Check
48 Days.
Zero Deferred Items.
Day 0
2025-03-04
Induction Phase
Aircraft Received
Full induction photography, logbook audit, and initial workscope review completed within 24h of arrival.
Day 2–5
2025-03-06
Workscope Phase
Workscope Defined
Full D-check workscope including SB 53-3059, AD 2024-11-12, and customer-directed cabin reconfiguration.
Day 7–18
2025-03-11
Teardown Phase
Structural Access
Complete structural teardown with zone-by-zone NDT. All panels catalogued on status board with barcode tracking.
Day 19–32
2025-03-29
Findings Phase
Additional Findings
28 additional findings managed. All Cat A items dispositioned within 48h via dedicated MRB team. Zero deferred items at redelivery.
Day 41–47
2025-04-14
Close-Out Phase
Systems Close-Out
All 1,840 panels reinstalled and torqued to spec. 14 ground tests completed including hydraulic, pneumatic, and avionics functional.
Day 48
2025-04-21
Redelivery Phase
Aircraft Redelivered
Redelivered 2 days ahead of contracted schedule. Full documentation package including EASA Form 1, CRS, and updated logbooks.
// TAT Benchmarks
Faster Than
Industry Average.
TAT performance benchmarked against IATA-published industry averages for equivalent check types. Data current as of Q4 2025.
// Regulatory Approvals
// Capability Statement — PDF
Full Approval Matrix + Fleet Coverage
32-page technical capability document. Includes all OEM authorizations, tooling inventory, and fleet coverage tables.
// Slot Availability
Request a Check
Induction Slot.
Current slot availability for Q2–Q3 2026. AOG support available 24/7 — our planning team responds within 4 hours on standard requests.